Built for BR18 · SBi 271 · A1–B3

Documentation an engineer can stand behind.

Agentic documentation for structural engineers.

Request a demo

One connected system

One project. One set of facts. Every document aligned.

faktos reads the project, resolves evidence into an engineer-approved record, and carries those decisions through A1–B3.

A1–B3
Project evidence01 / 04

Drawings · calculations · reports

Agentic workflow02 / 04

Read · compare · reconcile

Engineering decision layer03 / 04

Engineer-approved project record

Controlled documentation04 / 04

A1 through B3

How faktos works

The package becomes a system, not a collection of files.

faktos works across the whole project while keeping every claim inspectable.

01 / 03

It reads the project, not just the prompt.

Drawings, calculations, reports, and correspondence are read together. Every observation keeps its page, sheet, and revision.

S-204 · rev 06

Exact source

S-204 · 14.5

Located in 1.8 s

02 / 03

Engineers decide what becomes true.

faktos surfaces agreement, conflict, and absence. You approve what stands. Nothing becomes a project fact by accident.

Project fact / 014

Approved

Construction class

KK3

A1 · §1.3

B1 · §2.1

03 / 03

A change travels everywhere it should.

Approved facts stay connected to every field that depends on them. Update once, then review precisely what changed across A1–B3.

Project fact · rev. 04

4 dependencies

Concrete strength

C35/45

A1.2
A2.4
A3.1
B1.3

Review precisely what changed.

Designed for accountable engineering

Automation, with engineering judgement intact.

faktos does the searching, comparing, and carrying. The engineer decides what the project says.

01
Cited by default
Every populated field points back to the exact source passage, sheet, and revision.
02
Approval is a gate
Models propose. Engineers decide what becomes part of the project record.
03
History stays intact
Sources, decisions, changes, and exports remain connected as one auditable record.

See your workflow in faktos

Bring the project. We’ll show you the system.

A focused walkthrough using the way your firm already works.

  • 01Your project material
  • 02Your company templates
  • 03Your review standard